Yen Phong II Industrial Zone

65 Van Mieu Str., Dong Da Dist., Hanoi
Contact:
Add:
|Position: |Tel: | Fax: | Mobile: | Email: | Website:
# Start Planning area 480ha Available area for rent Update 2015-02-02
Location Introduction
Adjacent 18 highway
Distance to major cities 30 km from Ha Noi; 03 Km from Bac Ninh, 07 km from Bac Ninh hospital .
Nearest Seaport Yen Phong IZ, Yen Phong district, Bac Ninh province is one of the few industrial parks have natural geographical location and transportation system domination and extremely convenient traffic. From Yen Phong Industrial Z
Nearest Airport 55km from Noi bai airport
Nearest railway station 35 km from Ha Noi station

Google Map

Photo

Video

Infrastructure Cost
Tracfic system
* Roads: Industrial zone is located in the dynamic economic growth triangle of Hanoi - Hai Phong - Quang Ninh which has convenient traffic systems such as: ring road North-South (including No. 1A National Highway and No.1B National Highway connecting Hanoi - Lang Son) and ring road East-North-new No.18 National Highway, intersection of the old No.18 National road connects Noi Bai international airport and Cai Lan seaport, No.38 National highway connects three provinces of Bac Ninh - Hai Duong - Hai Phong. * Airport: 14km far from Noi Bai airport (10 minutes travel by car). * Railway: the Industrial zone situates near by the international railway from the south to the Huu Nghi – Lang Son Customs, and China customs, Ha Noi – Bac Ninh railway to Cai Lan (Quang Ninh), it is also 10 km far from Lim railway station ( Bac Ninh ) (express railway from Yen Vien (Hanoi) to Cai Lan currently).
Electrical services
obtained from the national power grid through substation 110/22KV with capacity at 100 MVA
Gas services
ICT services
provided by Bac Ninh post office and located in industrial zones operation center, optic fiber cable routes are underground arranged in the technical corridor to land lots which create a modern information network reach international standards and meet all requirements fastly and fully for domestic and global communication services
Water service
* Water supply: - Clean water supply station with capacity at 2 x 7.500m3/ day (diameter of water supply pipe is D 150mm-D400mm) has average depth for placing pipes is 0.9-1.5m. Water is taken from borehole's underground water resource to water supply station. - The water supply system is connected to fence of each plant. *water drainage: Rainwater drainage system and wastewater drainage system are designed on open ditches with structure of the reinforcing concrete slab for ditch side and building the coarse rock lines running parallel with the traffic road: Rain water will flow into underground pipelines system and spill to ditches in the area. The diameter of the drainage pipe is D800mm-D1250mm.
Wastewater
Wastewater treatment station has capacity at 12,000m3/day (Industrial wastewater, as calculated, account for 80% of supply water volume). Wastewater drainage pipe has diameter of D300mm-D750mm.
Finance
* Finance – Banking - Insurance: banking system of VietinBank, Vietcombank, BIDV is 6km far from the industrial zone, in addition the branch offices are located in the industrial zone.
Training School
* Training schools and centers: Bac Ninh province has 14 universities, colleges and technical high school. There are Bac Ha university, Fitness and sport university, Bac Ninh pedagogical college, Viet-Nhat language and technology college, agricultural high school, Bac Ninh art and culture high school, medicinal high school, Thang Long technical high school, , Bac Ninh pedagogical college, industrial economic management school. Vocational training center: in Yen Phong II industrial zone.
Housing for workers
* Housing for workers: Area of 54.07 ha is planned in the industrial zone. Some workers can hire housing in resident area. * Other manufactures: 54.07 ha area was planned and built in urban area includes: Amusement parks; trade centre, stadiums, banks, vocational training schools, housing for workers, housing for experts
Other utility
The water supply system and fire fighting hydrants with the modern fire protection equipment are arranged along the internal road of IZ. The distance between two fire hydrants is 120m - 150m and fire hose's diameter is D125mm. - Trees and area covered trees occupies 15-30 % of total area. - The main roads have two lanes with width of 38m. Branch roads have width of 27.00m and 18.50m. - Along the roads are pavements of 6 -7.7 m wide, where are arrange underground technical corridors such as electricity, water drainage and supply system, communication. * Security: Police station of the district is 5km far from the industrial zone; in addition security stations are founded in the industrial zone. * Hospitals: Yen Phong district medical center is 5km far from the industrial zone * Logistics and transport, customs: Bac Ninh customs department is situated in the center of the industrial zone. All of customs procedures are solved in time onsite in the industrial zone. * Consultant - Audit: Sico company will support enterprises. * Tourism - travelling – accommodation: in the center of the district, is 5km far from the industrial zone.
Land lease price - Site-clearance cleaning land: 30USD/m2 - Site-clearance cleaning land + leveling: 32USD/m2 - Site-clearance cleaning land + fully featured infrastructure: 70USD/m2
Factory lease price USD0.65/m2/year – yearly payment
Management fee
Electricity prices *production power - Normal time: VND 2,104 / kWh (equivalent to 0.102 USD / kWh) From Monday to Saturday: 4:00 to 9:30 am, 11:30 am - 17 pm and 20:00 – 22:00pm Sunday: 4:00 - 22 pm - Midnight: VND 1,199 / kWh (equival
Water prices +/ For services business:VND5,000/m3 +/ For living: VND 8,500/m3
Labor costs *salary - Minimum of salary: VND 2,100,000/person/month - General workers: VND 2,600,000/person/month - Technical workers: VND 6,200,000/person/month - Manager: VND 6,200,000/person/month
Solid waste disposal fee
Wastewater treatment fee VND 4,500/m3
Other expenses Environmental protection fees VND 500/m3; * Tax exemption for importing commodity to create fixed assets:
Investment Incentives
Priority Industries Contact info
Electrical – electronic, high-tech mechanics, complete electronics assembly, telecommunications
INVESTMENT PROMOTION CENTER - NORTH VIETNAM
Mobile: +84-4-37475998
Email: ipcn@mpi.gov.vn