Tracfic system |
Border to corridor of No. 5 National highway (km No.23), connect Hanoi-Hai Phong; besides to the No.39 National highway. |
Electrical services |
The power company supplies 60,000 KvA power source . The nominal voltage is 22 Kv, frequency: 50Hz. |
Gas services |
|
ICT services |
Telecommunication system meets the international standard and always ready to supply the demands on communication, domestic and international postal services, high-speed data transmission. The underground cable system is connected directly into fence of each plant. |
Water service |
The water supplying plant has designed capacity of 12,000m3/day (available one 4,000m3/day water supplying plant). In addition of provincial water supplying plant with capacity of 3,000m3/day. The water supplying network is connected to fence of each enterprise. |
Wastewater |
The wastewater treatment plant with the designed capacity of 15.000m3/day (available one wastewater treatment plant with capacity of 10,000m3/day) |
Finance |
Many banks (Techcombank, ACB, Vietcombank, Sacombank, Agribank, Bank of investment and development of Vietnam, etc) have braches in Pho Noi, the nearest distance far from IZ is 2 km (expected to open transaction office of banks in IZ). Currently there are 3 ATMs of Techcombank, Vietcombank and Donga bank in IZ to meet the need of the labor. Some agencies provide the insurance service, such as: Bao Viet insurance, BIC, etc. |
Training School |
Hung Yen has high quality training system of manager, technician such as: Hung Yen technical pedagogy university (13 km far from IZ), Tau Quoc technical worker school (9 km far from IZ), Finance and Business Administration university (4 km far from IZ), Hung Yen Bach Khoa College (2 km far from IZ), etc. |
Housing for workers |
with area of 6.56 ha, meet all the housing needs for employees and experts. |
Other utility |
|
|
Land lease price |
USD 60 -65/m2/46 years |
Factory lease price |
USD 2- 3 /m2/month |
Management fee |
|
Electricity prices
|
- Normal hours: VND 1,339/Kwh (equivalent to USD 0.064/Kwh). Application time: Monday to Saturday: 04:00 am – 9:30 am, 11:30 am – 05:00 pm, 08:00 pm – 10:00 pm, Sunday: from 04:00 am to 10:00 pm. - Off-peak hours: VND 85 |
Water prices
|
VND 5,500/m3 (equivalent to USD 0.26/m3)- monthly payment |
Labor costs
|
- Minimum wage: VND 2.1 million/month. - Unskilled workers wage: VND 2– 3 million/month. - Skilled labor wage: VND 4 – 6 million/month. - Manager wage: VND 5– 10 million/month. - Overtime wage: normal day: 150% basic wag |
Solid waste disposal fee
|
|
Wastewater treatment fee
|
- VND 9,000/m3 to dyeing wastewater; - VND 14,000 VND/m3 to other industries; wastewater volume is determined by 80% of input water volume. |
Other expenses
|
|
Investment Incentives
|
|
|