Pho Noi A Textiles Industrial Zone

No. 19 km, No. 5 National highway, Hung Yen province.
Contact:
Add:
|Position: |Tel: | Fax: | Mobile: | Email: | Website:
# Start Planning area 594 ha Available area for rent 205 ha Update 2015-02-05
Location Introduction
Bordering with the corridor of No. 5 National highway (Km No.19), connecting Hanoi - Hai Phong; 24 km far from Hanoi, 60 km far from Noi Bai airport, 75 km from Hai Phong harbor, 120 km far from Quang Ninh deep-sea port.
Distance to major cities 24 km far from Hanoi
Nearest Seaport 75 km from Hai Phong harbor, 120 km far from Quang Ninh deep-sea port.
Nearest Airport 60 km far from Noi Bai airport
Nearest railway station

Google Map

Photo

Video

Infrastructure Cost
Tracfic system
Bordering with the corridor of No. 5 National highway (Km No.19), connecting Hanoi - Hai Phong; 24 km far from Hanoi, 60 km far from Noi Bai airport, 75 km from Hai Phong harbor, 120 km far from Quang Ninh deep-sea port.
Electrical services
Power is supplied continuously and stably via two 110/22KV substations with capacity of 4x63MVA. Medium voltage network ( 22kV ) is arranged along the internal roads inside the IZ.
Gas services
ICT services
Telecommunication system meets the international standard and always ready to supply the demands on communication, domestic and international postal services, high-speed data transmission. The underground cable system is connected directly into fence of each plant.
Water service
Water supply plant is constructed with capacity of 12,000 m3/day; water source is taken directly from the groundwater source. Rainwater drainage system and wastewater drainage system are constructed separately (industrial wastewater and domestic wastewater). Rainwater is collected by sewer system and get out of the rivers in the area. Wastewater is collected to general sewage treatment plant of IZ.
Wastewater
Wastewater treatment plant is constructed in phase I with capacity of 3,000 m3/ day. The IZ provides the service of collecting and transporting waste and garbage for enterprises. The solid waste from plants will be classified, collected on-site and transported to concentrated area of waste in industrial zone before being transported to elsewhere for processing under the provisions.
Finance
Many banks (Techcombank, ACB, Vietcombank, Sacombank, Agribank, Bank of investment and development of Vietnam, etc) have braches in Pho Noi, the nearest distance far from IZ is 2 km (expected to open transaction office of banks in IZ). Currently there are 3 ATMs of Techcombank, Vietcombank and Donga bank in IZ to meet the need of the labor. Some agencies provide the insurance service, such as: Bao Viet insurance, BIC, etc.
Training School
Hung Yen has high quality training system of manager, technician such as: Hung Yen technical pedagogy university (15 km far from IZ), Tau Quoc technical worker school (7 km far from IZ), Finance and Business Administration university (1 km far from IZ), Hung Yen Bach Khoa College (3 km far from IZ), etc.
Housing for workers
In addition to the residential housing area, IZ always are available for rental housing. The Pho Noi urban with scale of 300 ha will ensure enough house for employees.
Other utility
Pho Noi general hospital (2km from IZ) is planned and constructed modernly and meet all the health care needs. Pho Noi post office (2km from IZ) is ready to meet the needs of the businesses.
Land lease price USD 65-70 /m2 /project time.
Factory lease price USD 2- 3/m2/month
Management fee
Electricity prices - Normal hours: VND 1,339/Kwh (equivalent to USD 0.064/Kwh), application time: Monday to Saturday: 04:00 am – 9:30 am, 11:30 am – 05:00 pm, 08:00 pm – 10:00 pm, Sunday: from 04:00 am to 10:00 pm. - Off-peak hours: VND 85
Water prices VND 5,500/m3 (equivalent to USD 0.26/m3)- monthly payment
Labor costs - Minimum wage: VND 2.1 million/month. - Unskilled workers wage: VND 2– 3 million/month. - Skilled labor wage: VND 4 – 6 million/month. - Manager wage: VND 5– 10 million/month. - Overtime wage: normal day: 150% basic wag
Solid waste disposal fee
Wastewater treatment fee VND 5,500/m3 and monthly payment; wastewater volume is determined by 80% of input water volume.
Other expenses
Investment Incentives
Priority Industries Contact info
High-tech and modern Industry, supporting industry, electric assembly, electronic, mechanics, automobile, motorcycle, etc.