Hoa Xa Industrial Zone

Wards: My Xa, Loc Ha – Nam Dinh city, Nam Dinh province
Contact:
Add:
|Position: |Tel: | Fax: | Mobile: | Email: | Website:
# Start Planning area 285.27 ha Available area for rent 201.29 ha Update 2015-02-05
Location Introduction
Wards: My Xa, Loc Ha – Nam Dinh city, Nam Dinh province
Distance to major cities
Nearest Seaport
Nearest Airport
Nearest railway station

Google Map

Photo

Video

Infrastructure Cost
Tracfic system
- The North is adjacent to No.21 National Highway; - The South is adjacent to My Xa resident area of My Xa commune; - The East is adjacent to Kenh Gia drainage ditch; - The West is adjacent to Vinh Giang river
Electrical services
- Electrodynamics supply project with 22KV for the industrial zone is completed; - Power supply source is taken from My Xa 110KV substation (300 meters far from the industrial zone) which support for all electrical power demand in the industrial zone. - The roads in the industrial zone are lightened by lamp system of mercury high pressure and Sodium bulb with capacity of 150W- 220V, is mounted on the 10 meter-high steel column.
Gas services
ICT services
The industrial zone has good location in Nam Dinh City, which is convenient for supplying telecommunication and internet services.
Water service
*water supply system: - The water source in the industrial zone is supplied from Nam Dinh water supply company. - Water supplies for the industrial zone is obtained from main water plant of Nam Dinh city through pressure booster pumping station to maintain the network. - Water network is supplied for IZ is the closed loop network. To distribute water for the plants, water supply pipelines will be installed pending valves for each factory depending on the water consumption. * water drainage system: - Two main drainage ditches are Doc ditch flowing to Kenh Gia pumping station and Ngang ditch flowing to Cau Oc river - Rainwater drainage system of IZ is entirely self-flowing system and independent with the wastewater drainage system.
Wastewater
- Wastewater treatment station has capacity of 4,500 m3/day located in the northwest industrial zone of Lot M2. - Wastewater drainage system is the self-flowing system so that the wastewater will flow to the wastewater pumping station at the end of basin. - -Intermediate station of hazardous waste is planned in Lot M3 to collect, transport and process hazardous waste.
Finance
Training School
Housing for workers
Other utility
Land lease price About VND 2,500/m2/year
Factory lease price About USD 1.5/m2/month
Management fee
Electricity prices - Normal time : VND 1,339/KWh ; - Off-peak time : VND854/KWh ; - Peak time : VND2,421/KWh
Water prices About VND 11,500/m3
Labor costs - Minimum salary: VND 1,400,000; - Social insurance: According to State regulations; - Health insurance: According to State regulations
Solid waste disposal fee
Wastewater treatment fee VND 6,500/m3 (excluding environment protection fee)
Other expenses
Investment Incentives
Priority Industries Contact info
INVESTMENT PROMOTION CENTER - NORTH VIETNAM
65 Van Mieu Str., Dong Da Dist.,Hanoi
Mobile: +84-4-37475998
Email: ipcn@mpi.gov.vn